A significant milestone in the M7 Motorway widening project at Eastern Creek has been achieved with the successful installation of two major bridge girders over the Great Western Highway. The operation showcased advanced heavy lifting techniques, utilizing dual crane coordination for precise placement of a 58-tonne concrete structure.

Technical Specifications

Component Detail Implementation
Girder Weight 58 tonnes Concrete structure
Primary Crane 750 tonne capacity Main lift
Secondary Crane 650 tonne capacity Support lift
Location Great Western Highway Critical crossing
Project Purpose M7 widening Capacity increase

Operational Parameters

Element Specification Purpose
Span Configuration Two-part installation Strategic placement
Lane Addition Third lane both directions Capacity enhancement
Traffic Management Highway crossing Safety coordination
Lift Coordination Dual crane operation Precise positioning
Infrastructure Integration Bridge widening Network expansion


More Info


Discover more from Construction Methodology

Subscribe to get the latest posts sent to your email.

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Construction Methodology

Subscribe now to keep reading and get access to the full archive.

Continue reading