Project Overview
Successful implementation of complex heavy haulage operation across 450km of Western Australian outback, demonstrating advanced logistics planning and specialized transport capabilities for oversized mining equipment.
Load Specifications
| Parameter | Measurement | Challenge |
|---|---|---|
| Weight | 365 tonnes | Extreme mass |
| Width | 14.5 meters | Road clearance |
| Height | 13.5 meters | Overhead restrictions |
| Length | 33.5 meters | Component size |
| Combination Length | 97 meters | Total transport |
Route Challenges
| Element | Constraint | Solution |
|---|---|---|
| Distance | 450km | Detailed planning |
| Terrain | Rugged outback | Route engineering |
| Restrictions | Road regulations | Permit management |
| Infrastructure | Limited capacity | Structural assessment |
| Access | Remote areas | Support logistics |
Key Project Elements
. Technical Implementation:
- Specialized transport configuration
- Load distribution engineering
- Route clearance verification
- Transport stability management
. Logistics Coordination:
- Multi-team integration
- Support vehicle deployment
- Communication systems
- Schedule management
. Operational Excellence:
- Safety protocols
- Contingency planning
- Environmental considerations
- Resource optimization
Discover more from Construction Methodology