The reconstruction of Austria’s highest bridge on the West Autobahn demonstrates advanced engineering capabilities through extensive post-tensioning work and innovative bridge sliding techniques. The project combines structural enhancement with environmental consideration.

Technical Specifications

Component Quantity Detail
Structure Length 420m x 2 Dual carriageway
Post-Tensioning 570 tendons Internal system
Strand Weight 300 tons Total installation
Skidding Distance 14.35m Transverse movement
Daily Traffic 50,000+ vehicles Design capacity

Implementation Metrics

Operation Achievement Impact
Timeline Reduction 4 weeks Schedule optimization
Environmental Offset 4,000 trees Site renaturalization
Concrete Recycling Old structure Material reuse
Precision Movement First of scale Technical innovation
Traffic Management Continuous flow Network maintenance

Key Project Elements

. Structural Implementation:

  • Post-tensioning installation
  • Bridge skidding operation
  • Concrete pour coordination
  • Form traveler integration

. Environmental Considerations:

  • Concrete recycling program
  • Tree planting initiative
  • Site restoration
  • Impact minimization

. Technical Achievement:

  • Schedule optimization
  • Precision engineering
  • Innovation implementation
  • Quality assurance

More Info

 

 


Discover more from Construction Methodology

Subscribe to get the latest posts sent to your email.

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO

Discover more from Construction Methodology

Subscribe now to keep reading and get access to the full archive.

Continue reading