Central Railway’s tunnel development project employs Sandvik’s specialized excavation equipment, including advanced tunneling jumbos and roadheaders, demonstrating modern tunnel construction methodology in railway infrastructure expansion.
Equipment Specifications
| Machine Type | Model | Capability |
|---|---|---|
| Tunneling Jumbo | DT1132i | Three-boom system |
| Operation | Electro-hydraulic | Precise control |
| Application | Tunnel/Cavern | Versatile use |
| Roadheader | MT361 | Mining/Tunneling |
| Control | Advanced systems | Accurate excavation |
Technical Features
| Component | Specification | Benefit |
|---|---|---|
| Boom System | Triple configuration | Enhanced coverage |
| Power Source | Electro-hydraulic | Efficient operation |
| Control System | Digital precision | Accurate drilling |
| Application Range | Multiple formats | Operational flexibility |
| Performance | High-speed drilling | Project efficiency |
Discover more from Construction Methodology
Subscribe to get the latest posts sent to your email.






