Central Railway’s tunnel development project employs Sandvik’s specialized excavation equipment, including advanced tunneling jumbos and roadheaders, demonstrating modern tunnel construction methodology in railway infrastructure expansion.

Equipment Specifications

Machine Type Model Capability
Tunneling Jumbo DT1132i Three-boom system
Operation Electro-hydraulic Precise control
Application Tunnel/Cavern Versatile use
Roadheader MT361 Mining/Tunneling
Control Advanced systems Accurate excavation

Technical Features

Component Specification Benefit
Boom System Triple configuration Enhanced coverage
Power Source Electro-hydraulic Efficient operation
Control System Digital precision Accurate drilling
Application Range Multiple formats Operational flexibility
Performance High-speed drilling Project efficiency

 


More Info

 


Discover more from Construction Methodology

Subscribe to get the latest posts sent to your email.

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO

Discover more from Construction Methodology

Subscribe now to keep reading and get access to the full archive.

Continue reading