LTM1400, Argonaut Gold Inc.’s open pit mine, in Ontario, Canada
“Mammoet Canada East’s team has been busy with steel erection at the Magino mine, Argonaut Gold Inc.’s open pit mine,…
Canopies for Platforms 12-14 at Sydney’s Central Station
“NBnew look canopies for Platforms 12-14 at Sydney’s Central Station are taking shape. They’ll replace the previous structures that had…
Nord Stream 2
“The twin pipeline stretches approximately 1,234 kilometres through the Baltic Sea from Russia to Germany, a route that largely runs…
Escalator installation methodology
Installing an escalator is a complex engineering project that requires careful planning, precision, and expertise. From initial site assessment to…
180 George Street Sydney – Final Pour (Level 56)
“Yesterday marked a significant milestone in the delivery of 180 George Street at Sydney Place – the final pour of…
Boring Test Tunnel, The Boring Company (TBC)
Created by Elon Musk, founder of Tesla and SpaceX, The Boring Company (TBC) constructs safe, fast-todig, low-cost, and zero-emissions transportation…
Rix’s Creek Rail Loop
Rix’s Creek, Bloomfield has operated the Rix’s Creek Open Cut Mine since 1990. It is our largest operation and currently…
Central Precinct (Sydney) – Strategic Framework (March 2021)
Central Precinct will be a vibrant and exciting place that unites a world-class transport interchange with innovative and diverse businesses…
Chacao Bridge Project
The Chacao Bridge is a 2.75km-long bridge being built by the Ministry of Public Works (MOP) of Chile. Upon completion,…
The Types of Footings and Foundations Explained Insights of a Structural Engineer – (14:32)
By Brendan Hasty: ‘There are many types of Footings and Foundations, each with their benefits and drawbacks. I (Brendan Hasty)…