Central Station works – Escalators Installation. Australia – Sydney
The largest escalators in the southern hemisphere have been installed at Central Station as part of Sydney Metro’s transformation of…
Sydney Metro – Escalator installations begin (April 2018)
Sydney’s new metro railway stations are coming to life with 42 escalators being installed at eight new stations in the…
Cross River Rail Sites – 2021 Construction Timelapse
2021 was a big year on Cross River Rail, across all of our worksites, and we’re super proud of what…
Timelapse: track lowering at -Fairfield Station – Christmas Closedown 2021
Cross River Rail crews worked day and night over Christmas and New Year and achieved some pretty big feats of…
Escalator Installation – Lifting Equipment
Gantry, air hoists, and round slings for escalator installs at the under construction Carnival Cruise Line Terminal F at the…
Equipment, Piling Rig – HÜTTE HBR202E DRILLING RIG
Hutte Bohrteehnik’s compact class drill rigs HBR 202, with integrated electric motor or diesel engine, was designed to fulfill clients’…
Piling between live tracks – Keller Australia
The project As part of the Sydney Metro Project, Central Station is undergoing a new entrance and central walk in…
First escalators installed at Waterloo Station (2022)
Work continues to get Waterloo Station ready for new metro rail services with four escalators now installed. There will be…
Parkville Station: Excavation works (2018)
A construction method called ‘bottom up’ will be used to build Parkville Station, which involves excavating the box down to…
Wellington Street / Panorama Drive road upgrade program
https://www.youtube.com/watch?v=NcR4cX7z4x4