Project Overview

A significant architectural achievement combining timber and steel in portal frame construction spans 280ft (85m) over a soccer court at the Community Lifestyle Center, demonstrating innovative hybrid structural engineering.

Technical Specifications

Parameter Detail
Span Length 280ft (85m)
Structure Type Timber-Steel Portal Frames
Assembly Method 3-segment preassembly
Primary Use Soccer Court Coverage
Material Integration Hybrid Glulam-Steel
Installation Phase In Progress

Structural Components

Element Material Function
Top Chords Glulam Compression
Bottom Chords Steel Tension
Struts Glulam Compression
Web Members Steel Tension
Gable Walls Glulam/Steel Lateral Support
Bracing Light Steel Tension System

Technical Innovation

The design features:
. Material optimization
. Load distribution efficiency
. Structural hybridization
. Assembly optimization
. Installation efficiency
. Performance enhancement

Construction Benefits

Key advantages include:
. Rapid installation
. Optimized material use
. Enhanced aesthetics
. Structural efficiency
. Environmental sustainability
. Cost effectiveness


More Info

 


Discover more from Construction Methodology

Subscribe to get the latest posts sent to your email.

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Construction Methodology

Subscribe now to keep reading and get access to the full archive.

Continue reading