Project Overview
Implementation of new PM 2 high-performance coaters demonstrates innovative pre-assembly strategy and precision installation techniques, minimizing production disruption through coordinated heavy lift operations.
Technical Specifications
Component | Detail | Implementation |
---|---|---|
Equipment | PM 2 Coaters | High-performance |
Assembly | Pre-fabricated | Off-line build |
Installation | Single-piece lift | Dual crane operation |
Timing | Pre-shutdown | Production optimization |
Application | Paperboard | Enhanced production |
Installation Strategy
Element | Method | Benefit |
---|---|---|
Pre-assembly | Off-line construction | Minimal downtime |
Frame Design | Custom engineered | Precise fit |
Lift Operation | Dual overhead cranes | Controlled placement |
Production Impact | Minimized gap | Business continuity |
Installation Timing | Coordinated shutdown | Efficiency optimization |
Key Project Elements
. Technical Planning:
- Custom frame engineering
- Pre-assembly strategy
- Lift coordination
- Installation sequencing
. Team Integration:
- Safety coordination
- Engineering oversight
- Operations management
- Construction execution
. Operational Benefits:
- Reduced downtime
- Enhanced capability
- Production efficiency
- Quality improvement